Age | Commit message (Collapse) | Author | |
---|---|---|---|
2007-01-29 | Updated Todo.txt | sicarius | |
2007-01-20 | Softwarekonzept aktualisiert | meyma | |
2007-01-20 | Updated Todo.txt | sicarius | |
2007-01-18 | +++ corrected file location | masterm | |
2007-01-16 | Changed some things in Concept directory | sicarius | |
2007-01-16 | Slight changes in Todo.txt | sicarius | |
2007-01-15 | Added some usefull organisation stuff, | sicarius | |
that will be used during our work-time. This includes a contacts file, in which Data of every Member is saved. Incomplete members will be filled up soon or will be deleted. The TimeTable file Includes general events, and will also include our team-time-coordination The Todo file lists everything that is completed or supposed to be done. | |||
2007-01-14 | +++ added soccer robot framework | masterm | |
2006-12-04 | Added long awaited sheet that compares one wheel with the basic plan. This ↵ | sicarius | |
shows space-dangers | |||
2006-12-04 | Zeichnung der Bodenplatte incl. genauen Massen eingefuegt | meyma | |
2006-12-04 | Produktbilder von den Artikeln von Conrad eingefuegt | meyma | |
2006-11-26 | Zeichnung(Scan) vom Grundriss eingef?gt | meyma | |
2006-11-25 | relocating should go in one revision next time - this three were due to ↵ | sicarius | |
problems i had. now relocating is finished. | |||
2006-11-25 | Added general directory for Hardware-orders | sicarius | |
2006-11-23 | Added Warenkorb from Robotikhardware.de, | sicarius | |
modified Hardwareliste.ods | |||
2006-11-22 | (no commit message) | meyma | |
2006-11-22 | (no commit message) | meyma | |
2006-11-22 | added HardwareListe. | sicarius | |
2006-11-20 | Sponsorenschreiben als .doc und .pdf | sicarius | |
Checken auf evtl. Verbesserung ! | |||
2006-11-20 | +++ missed one file | masterm | |
2006-11-20 | +++ svn structure cleanup | masterm | |
2006-11-20 | +++ newer version of concept level 1 | masterm | |
2006-11-20 | Added Soccer organisation & hardware stuff | sicarius | |
unorderd jet |